Real Project · Dubai Creek Harbour
1-Bedroom Move-Out Painting in Dubai Creek Harbour — AED 900
Home painting services in Dubai, shown through one real job: an 820 sq ft 1-bedroom apartment at Palace Residences, Dubai Creek Harbour. The landlord called after the tenant moved out; the internal walls were repainted in the existing colour for AED 900 including VAT.
AED 900 incl. VAT · Walls only · Painted in about 6 hours
Ask About 1-Bedroom Move-Out Painting
Property
820 sq ft · 1 bedroom · 1 bathroom
Painting cost
AED 900 including VAT
Included
Paint, materials and labour
Painting time
Same day, about 6 hours
Scope
Same-colour internal walls only
Paint
Jotun Durosan Action
Preparation
Minor bathroom cracks repaired
Excluded
Ceilings, balcony, cleaning
AED 900 is the actual cost of this completed 820 sq ft project and its agreed scope, not a universal package price.
The Brief
A landlord’s apartment after the tenant moved out
The landlord contacted us after the tenant left the apartment. The walls showed marks, scuffs and fixing holes from the tenancy, and the landlord wanted the internal walls refreshed in the existing colour.
Cost and Scope
What the AED 900 covered
Included in the painting price
Internal walls repainted in the existing colour with Jotun Durosan Action, plus repair of minor cracks in the bathroom. AED 900 included VAT, paint, materials and labour.
Not included
Walls only: ceilings were not painted, the balcony was not painted and no cleaning was included.
Before and After
Five views of the 1-bedroom wall repaint
Bedroom and doorway


Living area and kitchen


Living area and entrance


Kitchen and balcony


Bedroom and window


Process
From agent call to handover
- A real-estate agent we work with called about the vacant apartment.
- We collected the key from the agent’s Business Bay office, inspected the apartment and quoted the scope.
- We obtained the Emaar work permit, which the building requires before painting can start.
- The team protected floors, curtains and fittings, repaired the minor bathroom cracks and repainted the walls in about 6 hours.
- The key was handed back. On this job, the whole journey from the agent’s call to handover took within 24 hours.
Because North Property Care was already registered with Emaar, the required permit for this project was arranged quickly. Timing depends on the building and the scope; this job’s speed is not a guaranteed timeline.


1-Bedroom Painting Cost
Why another apartment may cost differently
Apartment size, wall condition, repairs, same-colour versus colour change, paint choice and whether ceilings or balconies are included all affect the quotation. This 820 sq ft job is one real example of painting cost in Dubai; your apartment will get its own agreed scope and price.
Working With Agents
An ongoing real-estate partnership
The real-estate company behind this job continues to work with us and now sends approximately 3–4 jobs per week.
Your Apartment
Request a move-out painting quote
See our apartment painting services in Dubai or the move-out painting Dubai guide to plan your handover.
Ask About 1-Bedroom Move-Out Painting